1 00:00:06,950 --> 00:00:04,309 for us eva 33 both crew members will 2 00:00:08,790 --> 00:00:06,960 start out at the u.s joint airlock we 3 00:00:10,950 --> 00:00:08,800 have chell here in the suit with the red 4 00:00:12,950 --> 00:00:10,960 stripes and scott will have the suit 5 00:00:14,549 --> 00:00:12,960 with the white stripes scott will bring 6 00:00:16,230 --> 00:00:14,559 out a crew lock bag that has all the 7 00:00:18,310 --> 00:00:16,240 tools from inside the space station that 8 00:00:20,070 --> 00:00:18,320 they'll need to use on this eva 9 00:00:21,750 --> 00:00:20,080 chell will pick out a vent tool bag 10 00:00:22,630 --> 00:00:21,760 that's on the zenith portion of the crew 11 00:00:25,509 --> 00:00:22,640 lock 12 00:00:27,269 --> 00:00:25,519 and he'll take that out to the work site 13 00:00:29,269 --> 00:00:27,279 from here he'll head all the way out to 14 00:00:30,390 --> 00:00:29,279 p6 and you'll set up what we call a 15 00:00:32,069 --> 00:00:30,400 slingshot 16 00:00:34,310 --> 00:00:32,079 it's a way to get the maximum length out 17 00:00:36,229 --> 00:00:34,320 of your tether 18 00:00:37,910 --> 00:00:36,239 he'll translate out to p6 pass the 19 00:00:40,869 --> 00:00:37,920 trailing thermal control radiator the 20 00:00:44,470 --> 00:00:40,879 ticker he'll stow the vent tool bag at 21 00:00:49,110 --> 00:00:47,270 and this will be set up later in the eva 22 00:00:52,310 --> 00:00:49,120 and then he'll head over to the fluid 23 00:00:53,590 --> 00:00:52,320 quick disconnect coupler 24 00:00:55,990 --> 00:00:53,600 scott will be right behind him they'll 25 00:00:57,430 --> 00:00:56,000 work together to remove a cover here and 26 00:00:59,910 --> 00:00:57,440 then they'll drive a bolt which will 27 00:01:01,670 --> 00:00:59,920 open a valve and allow flow into the 28 00:01:06,310 --> 00:01:01,680 photovoltaic radiator that you see on 29 00:01:08,950 --> 00:01:07,750 they'll work together to get the cover 30 00:01:11,270 --> 00:01:08,960 back on 31 00:01:12,950 --> 00:01:11,280 and then scott will head over to the p3 32 00:01:15,109 --> 00:01:12,960 p4 jumper 33 00:01:17,270 --> 00:01:15,119 and then chell will stay behind at this 34 00:01:19,109 --> 00:01:17,280 work site and he'll break the connection 35 00:01:21,109 --> 00:01:19,119 close the valves that link the 36 00:01:22,710 --> 00:01:21,119 photovoltaic thermal control system and 37 00:01:24,469 --> 00:01:22,720 the early external thermal control 38 00:01:27,429 --> 00:01:24,479 system 39 00:01:31,030 --> 00:01:27,439 i'll install one of those jumpers 40 00:01:33,190 --> 00:01:31,040 to keep it protected for the future 41 00:01:35,270 --> 00:01:33,200 here we have scott at the solar alpha 42 00:01:37,030 --> 00:01:35,280 rotary joint he's going to install the 43 00:01:38,870 --> 00:01:37,040 jumper across 44 00:01:44,789 --> 00:01:38,880 across the sarge 45 00:01:48,310 --> 00:01:46,469 and meanwhile chell is going to start 46 00:01:49,910 --> 00:01:48,320 setting up the vent tool and vent tool 47 00:01:51,590 --> 00:01:49,920 extender 48 00:01:52,789 --> 00:01:51,600 now we want to have this set up we're 49 00:01:55,109 --> 00:01:52,799 going to make sure that it's in good 50 00:01:56,469 --> 00:01:55,119 working order before we begin the fill 51 00:01:58,149 --> 00:01:56,479 we're going to need to vent the fill 52 00:02:00,789 --> 00:01:58,159 line to 53 00:02:02,069 --> 00:02:00,799 prevent over pressurization 54 00:02:05,109 --> 00:02:02,079 so we don't want to lock that line up 55 00:02:08,630 --> 00:02:06,950 at this point we'll be ready to start 56 00:02:11,910 --> 00:02:08,640 the fill we have scott over at the 57 00:02:13,589 --> 00:02:11,920 ammonia tank he'll reposition a jumper 58 00:02:15,830 --> 00:02:13,599 and that will route ammonia from the 59 00:02:17,990 --> 00:02:15,840 ammonia tank into the fill line 60 00:02:19,430 --> 00:02:18,000 after a short leap check 61 00:02:20,790 --> 00:02:19,440 as long as everything is successful 62 00:02:25,350 --> 00:02:20,800 there we'll have 63 00:02:27,510 --> 00:02:25,360 a chell mate the p5 p6 jumper over to p6 64 00:02:32,949 --> 00:02:27,520 and this will start the fill of the 65 00:02:37,190 --> 00:02:34,790 from there he'll head back over to the 66 00:02:39,030 --> 00:02:37,200 early ammonia servicer jumpers he'll 67 00:02:39,830 --> 00:02:39,040 open a valve and that will initiate the 68 00:02:41,589 --> 00:02:39,840 fill 69 00:02:42,630 --> 00:02:41,599 of the photovoltaic thermal control 70 00:02:44,869 --> 00:02:42,640 system 71 00:02:46,869 --> 00:02:44,879 we expect this to take about 20 minutes 72 00:02:48,949 --> 00:02:46,879 so while that fill is going on we're 73 00:02:51,190 --> 00:02:48,959 going to have chell retract the trailing 74 00:02:53,670 --> 00:02:51,200 thermal control radiator he'll be using 75 00:02:55,830 --> 00:02:53,680 a pistol grip tool which is basically an 76 00:02:58,470 --> 00:02:55,840 eva version of a cordless drill will 77 00:03:03,589 --> 00:02:58,480 drive a bolt about 50 turns and it'll 78 00:03:08,630 --> 00:03:06,070 once this is complete we expect the 79 00:03:10,470 --> 00:03:08,640 the fill to be finished as well 80 00:03:13,509 --> 00:03:10,480 so chow will head back to the early 81 00:03:15,350 --> 00:03:13,519 ammonia servicer jumpers one last time 82 00:03:17,830 --> 00:03:15,360 he'll close that connection between the 83 00:03:19,430 --> 00:03:17,840 two systems and stow them in a safe 84 00:03:23,110 --> 00:03:19,440 configuration 85 00:03:25,350 --> 00:03:23,120 and leave those two systems isolated 86 00:03:26,869 --> 00:03:25,360 he'll then pick up the bags that scott 87 00:03:28,710 --> 00:03:26,879 left behind there he'll move him to a 88 00:03:30,550 --> 00:03:28,720 new location that's more convenient for 89 00:03:32,869 --> 00:03:30,560 this portion of the eva 90 00:03:34,869 --> 00:03:32,879 and then he'll head down to the p5 p6 91 00:03:37,110 --> 00:03:34,879 jumper he'll break that connection in 92 00:03:39,350 --> 00:03:37,120 the fill line and route that to the vent 93 00:03:47,270 --> 00:03:39,360 tool and vent tool extender and this 94 00:03:51,110 --> 00:03:49,350 so you can see here the vent tool invent 95 00:03:53,589 --> 00:03:51,120 tool extender you see a cone showing 96 00:03:55,350 --> 00:03:53,599 where we expect to vent out the ammonia 97 00:03:56,830 --> 00:03:55,360 from the system 98 00:03:59,589 --> 00:03:56,840 here you can see some footage from 99 00:04:01,670 --> 00:03:59,599 sts-134 where drew feustel did the exact 100 00:04:04,229 --> 00:04:01,680 same task they did a fill of this system 101 00:04:06,309 --> 00:04:04,239 as well you can see he just opened the 102 00:04:07,670 --> 00:04:06,319 valve to the vent tool 103 00:04:09,509 --> 00:04:07,680 and you'll see him look back over his 104 00:04:11,509 --> 00:04:09,519 shoulder and you can see the venting of 105 00:04:15,350 --> 00:04:11,519 ammonia out of the system so we expect 106 00:04:17,189 --> 00:04:15,360 to have a very similar view on us eva 33 107 00:04:19,270 --> 00:04:17,199 expect that event to take about 17 108 00:04:20,789 --> 00:04:19,280 minutes to fully get all the ammonia out 109 00:04:22,550 --> 00:04:20,799 of the line 110 00:04:24,629 --> 00:04:22,560 meanwhile we'll have scott head over to 111 00:04:26,469 --> 00:04:24,639 the starboard cetacart he'll be 112 00:04:28,790 --> 00:04:26,479 reconfiguring this cedar cart so that we 113 00:04:31,590 --> 00:04:28,800 can take the mobile transporter to work 114 00:04:33,430 --> 00:04:31,600 site one and still rotate the sarge 115 00:04:38,950 --> 00:04:33,440 so he's going to fold over two brake 116 00:04:42,230 --> 00:04:40,230 from there he'll move over to the 117 00:04:44,710 --> 00:04:42,240 coupler he'll remove that and he'll 118 00:04:46,310 --> 00:04:44,720 attach it to the swing arm 119 00:04:48,230 --> 00:04:46,320 and he'll drive four bolts to release 120 00:04:49,909 --> 00:04:48,240 the swing arm and will now have the 121 00:04:51,430 --> 00:04:49,919 cedar card in a good configuration to go 122 00:04:53,270 --> 00:04:51,440 to work site one 123 00:04:54,310 --> 00:04:53,280 he'll translate to the aft side of 124 00:04:55,830 --> 00:04:54,320 station 125 00:04:57,909 --> 00:04:55,840 near the ammonia tank where he was 126 00:05:00,070 --> 00:04:57,919 working earlier 127 00:05:01,590 --> 00:05:00,080 and he'll stow that swing arm on a tool 128 00:05:03,590 --> 00:05:01,600 we call the terra 129 00:05:05,189 --> 00:05:03,600 this is a tool we haven't really used it 130 00:05:07,110 --> 00:05:05,199 all in the past but we finally found a 131 00:05:10,469 --> 00:05:07,120 use for it a stowage location for this 132 00:05:13,590 --> 00:05:11,909 so he'll stow it there then both crew 133 00:05:16,070 --> 00:05:13,600 members will head back to the solar 134 00:05:17,830 --> 00:05:16,080 alpha rotary joint now we've seen some 135 00:05:19,430 --> 00:05:17,840 vibrations in the data that we get down 136 00:05:22,150 --> 00:05:19,440 to the ground and we think that's 137 00:05:23,590 --> 00:05:22,160 because there's a strut that's loose 138 00:05:25,270 --> 00:05:23,600 so the crew members are going to both 139 00:05:27,189 --> 00:05:25,280 work and they're going to drive a bolt 140 00:05:29,110 --> 00:05:27,199 on two different struts i think it'll 141 00:05:30,550 --> 00:05:29,120 just be a fraction of a turn but 142 00:05:33,590 --> 00:05:30,560 hopefully that'll fix the vibration 143 00:05:37,189 --> 00:05:35,990 we'll then have scott head forward 144 00:05:40,150 --> 00:05:37,199 he'll remove 145 00:05:42,150 --> 00:05:40,160 the p3 p4 jumper across the sarge once 146 00:05:43,430 --> 00:05:42,160 this is removed and stowed we'll be able 147 00:05:45,270 --> 00:05:43,440 to rotate the 148 00:05:49,670 --> 00:05:45,280 solar alpha rotary joint again at the 149 00:05:55,110 --> 00:05:51,430 and chad will begin work on cleaning up 150 00:05:56,870 --> 00:05:55,120 the vent tool and vent tool extender 151 00:05:58,790 --> 00:05:56,880 again all the ammonia has been vented 152 00:06:01,749 --> 00:05:58,800 out of these lines at this point 153 00:06:04,710 --> 00:06:01,759 so he'll demate the p5 to p6 jumper from 154 00:06:06,390 --> 00:06:04,720 the vent tool he'll stow that on a dummy 155 00:06:10,150 --> 00:06:06,400 and then he'll begin coiling up the vent 156 00:06:14,390 --> 00:06:12,629 he'll pack that all back in its bag this 157 00:06:15,909 --> 00:06:14,400 is a bag that remains outside because it 158 00:06:17,990 --> 00:06:15,919 has ammonia in it we don't want to bring 159 00:06:19,350 --> 00:06:18,000 that back inside so he'll 160 00:06:21,749 --> 00:06:19,360 move that back to the airlock at the end 161 00:06:23,990 --> 00:06:21,759 of the eva 162 00:06:25,830 --> 00:06:24,000 now both crew members will meet up 163 00:06:28,550 --> 00:06:25,840 at the ticker and they'll work together 164 00:06:30,390 --> 00:06:28,560 to install six cinches 165 00:06:32,230 --> 00:06:30,400 so these cinches will compress the 166 00:06:34,189 --> 00:06:32,240 radiator hold it into place prevent it 167 00:06:36,550 --> 00:06:34,199 from being damaged here you can see on 168 00:06:38,790 --> 00:06:36,560 uscva7 the compression the crew needs to 169 00:06:40,550 --> 00:06:38,800 do in order to get a cinch installed i 170 00:06:42,790 --> 00:06:40,560 think it's about 10 pounds of force to 171 00:06:44,710 --> 00:06:42,800 push down on that radiator the crew will 172 00:06:47,270 --> 00:06:44,720 then work together to install a thermal 173 00:06:49,830 --> 00:06:47,280 cover over the ticker this will protect 174 00:06:51,670 --> 00:06:49,840 it from extreme thermal environments 175 00:06:53,909 --> 00:06:51,680 here we see a crew member working in one 176 00:06:56,070 --> 00:06:53,919 of our nbl training sessions 177 00:06:57,990 --> 00:06:56,080 to get that thermal cover installed over 178 00:06:59,350 --> 00:06:58,000 the ticker 179 00:07:00,950 --> 00:06:59,360 definitely something that it takes two 180 00:07:03,990 --> 00:07:00,960 people to do there is another crew 181 00:07:05,990 --> 00:07:04,000 member in the the top view here so one 182 00:07:07,749 --> 00:07:06,000 guy zenith one guy nader 183 00:07:09,990 --> 00:07:07,759 both crew members will pick up their 184 00:07:12,710 --> 00:07:10,000 respective bags and head back in to the 185 00:07:14,629 --> 00:07:12,720 airlock here we see scott with the vent 186 00:07:17,189 --> 00:07:14,639 tool extender bag he'll stow that on the 187 00:07:19,029 --> 00:07:17,199 zenith portion of the airlock 188 00:07:21,110 --> 00:07:19,039 chell will then on his way back in 189 00:07:22,150 --> 00:07:21,120 reconfigure the jumper at the ammonia 190 00:07:23,990 --> 00:07:22,160 tank 191 00:07:25,430 --> 00:07:24,000 he'll move it to the vent position in 192 00:07:27,189 --> 00:07:25,440 case we ever do get an over 193 00:07:29,589 --> 00:07:27,199 pressurization in the system we have the 194 00:07:31,749 --> 00:07:29,599 ability to vent overboard if we never 195 00:07:33,589 --> 00:07:31,759 needed to do that 196 00:07:34,710 --> 00:07:33,599 chow will then translate back towards 197 00:07:36,710 --> 00:07:34,720 the airlock 198 00:07:38,790 --> 00:07:36,720 he'll pick up scott's tether at the 199 00:07:42,790 --> 00:07:38,800 slingshot location 200 00:07:47,270 --> 00:07:44,550 and he'll have the two crew lock bags 201 00:07:49,270 --> 00:07:47,280 with him that are bundled together